INF 337 Week 5 DQ 2 Change Control System
Change Control System. The identification of all changes to
a project is only the first step for ensuring a control system is in place.
Describe the detailed steps you would implement for your project to ensure an
entire change control process is in place. Consider the following topics in
your answer: documentation, analysis, approval and implementation. Why is the
baseline configuration important to this topic? Respond to at least two of your
classmates’ postings.